I. CYBUS WAY, CHERRY LANE, PINEWOOD DRIVE AND CARLIN DRIVE A. GENERAL This site is part of Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located on the northeast intersection quadrant of Street Road and the Reading Railroad and involves several streets (Carlin Drive, Cherry Lane, and Pinewood Drive). The drainage problems are composed of excessive gutter flows and roadway flooding. There are also infiltration inlets on Cybus Way which are open bottom inlets which operate on percolation only. These inlets are located at a roadway low point and have clogged over the years of use due to sediment collection and poorly drained soils. The problem is compounded by a large contributing drainage area, and a limited existing storm collection system downstream. Most of the existing collection has been abandoned by paving over the collection inlets. It would appear that the inlets must have been filled with stone, concrete or other material(s) in order to structurally support the bituminous overlay. The existing collection system exists only in the lower portion of Carlin Drive. There is also a low point on the northwest corner of the intersection of Chrerry Lane and Carlin Drive with no inlet collection device. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. The study area involves approximately 20 acres which drain to one (1) inlet at the cul-de-sac on Carlin Drive. Stormwater collection systems are designed to collect and convey a 10 year frequency storm. Flows above this are expected to encroach into the roadway and to be conveyed to an outlet without causing harm to properties for up to a 100 year storm event. All flows are conveyed to the low point at the terminus of Carlin Drive via gutter flows presently, so a 10 year design storm is recommended. This is an oversize inlet box, however considering the abandoned upstream inlets and large drainage area, the inlet does not provide sufficient capacity. The outlet pipe from this collection structure is a 24" CMP, also undersized considering the upstream drainage area. computations indicate the terminal inlet has capacity for about one third the ten year flow, the pipe has capacity for about one third the 10 year flow and the gutter has capapcity for about one twentieth or one third the 10 year storm depending on flow encroachment width into the roadway. Even if the existing system was in service, it is severely undersized and lacking of suitable collection devices. C. PROPOSAL It is proposed to construct a storm collection system from the malfuctioning infiltration inlets located on Cybus Way to the cul-de-sac on Carlin Drive. The system will greatly reduce problems associated with gutter flow and also standing water in the vicinity of the infiltration inlets. There is one infiltration on Cybus Way (west of the two(2) at the low point) which is also not functioning. It is located on a slope, so that standing water is not a problem. No improvements are scheduled for this inlet since it is located at a much lower grade than the proposed collection system and there is no storm ystem in close proximity to connect it to. D. RESULTS The proposed improvements not only correct the filtration inlets on Cybus Way, but provide strategic collection points along the way which will greatly reduce gutter flows and flow encroachments into the roadway. It will also correct the pipe capacity problem at the terminus of Carlin Drive as this pipe size is to be increased.
Consideration was also given to an alternate storm sewer routing through residential properties located between Cybus Way and Pinewood Road. This laternate system would provide collection points within the residential property rear yards. This option was not evaluated further because of the potential difficulty of obtaining easements, potential damage to existing plantings, and the fact that the location of the storm sewer located in the streets allows the oportunity to connect additional inlets at the Cybus Way / Pinewood Drive intersection and extensions thereto should future demand require this.
In order to correct the above situation the following is required:
II. EAST MAPLE DRIVE A. GENERAL This site is part of the Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located on East Maple Road approximately 500' west of the intersection of Marigold Avenue. The problem is frequent flooding of the roadway, flooding of the garage of lot 847 and water encroachment into the yard of areas of lots 847 and 841. Based upon site investigations, it appears that these problems have been exacerbated by slight changes in roadway grades (settling crown, frost heaving near the inlet, accumulation of debris in the gutter), possible changing of driveway grades, additional upstream impervious surface (sheds, additions, etc.) and deterioration of the existing storm collection system. As such, flows are not fully intercepted on the north side of East Maple Drive due to grades and possible storm collection system insufficient capacity. Flows cross the crown of the road where there are no inlets, follow driveway grades and inadequate swales and cause flooding. It is noted that the owner of lot 847 has constructed a bituminous berm across the driveway in order to block flows from entering the garage. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. Additional inlets are proposed strategically along both sides of the roadway as necessary to intercept flows into the collection system. A larger cross pipe will supply the additional pipe capacity. The swale that the storm collection system discharges to will be enlarged in order to eliminate yard flooding and flooding of the existing shed. Check flows to the north side of East Maple Drive:
C. RESULTS In order to correct the above situation the following is required:
III. 945 & 950 EAST MAPLE DRIVE A. GENERAL This site is part of the Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located immediately north of the intersection of East Maple Drive and Woodland Drive. The problem is continuous flooding of lot 945, 951, and 950, and flooding of the roadway. Based upon site investigations, it appears that this problem is the result of poor lot grading and an improperly sized roadway culvert. The problems have been exacerbated by slight changes in roadway grades (settling crown), accumulation of debris in the drainage way, additional upstream impervious surface (sheds, additions, etc.) and deterioration of the existing storm collection system. As such, the area is very poorly drained, flows cross the roadway crown during minor storm events and the existing culvert appears to have insufficient capacity. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. A storm pipe colleciton system is proposed across the roadway (culvert replacement) and between the properties to alleviate standing water. The pipe on lot 896 has been enlarged and lowered in order to provide pipe capacity and to permit positive grading across the lot. The edge of roadway shoudl be regarded to direct roadway flows to the proposed flared end section instead of crossing the roadway crown which it does currently. The yard swale will be regraded to inlets which have been sumped for better efficiency and more positive drainage. Check flows to the west side of Maple Avenue: the calculated flow to this area is 12.1 cfs for a 2 year frequency storm event; and, the pipe capacity across the road from this location is 9.2 cfs << 12.1 cfs. C. RESULTS In order to correct the above situation the following is required:
IV. 970 & 971 WEST MAPLE DRIVE A. GENERAL This site is part of the Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located two hundred (200) feet north of the intersection of Central Avenue and West Maple Avenue. The problem is an obstructed drainage way. It appears that the homeowner of lot 970 piped and filled an existing drainage course that intercepts considerable upstream flow. An in-ground swimming pool was constructed on lot 970 and apparently in order to stabilize the steep side bank from the stream, the stream was replaced with a 12" plastic pipe, a 24" CMP and a considerable amount of fill. A sink hole is also occurring above the exisiting roadway culvert which appears to be caused by an improper joint in the culvert where two (2) sections of different diameter pipes (36" and 48") are connected with no junction structure. The upstream culvert is equipped with an inlet / weir structure which does not appear to permit proper swale conveyance which causes overflowing into the roadway area. This structure also presents a safety issue as it is an open 4' x4' x4' concrete pit along side of the roadway.
Based upon site investigations, a 36" / 48" CMP discharges to a 12" PEP. It appears that the area immediately downstream of the roadway culvert (36" / 48" CMP) will flood due to inadequate conveyance of the 12" PEP. This flooding most likely raises the water surface elevation during storm events which encroaches further onto neighboring properties than that of the condition prior to installation of the pool, the pipe and the fill. The improper roadway culvert joint must be repaired or the sink hole size will grow and eventually affect the roadway infrastructure. The inlet / weir structure should be replaced with a standard headwall and the upstream area regarded to route flows to the headwall. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting storm water computations have been provided for improvements to the area. The roadway culvert is to be replaced with a new pipe and headwall structure. The stream encroachment is to be rectified by replacing the 12" pipe with a larger pipe to allow a less obtrusive route for the drainage way. It is noted that the stream capacity prior to construction of the swimming pool can only be assumed, and as such, may not provide the same flow capacity as before the pool. The pipe will decrease flood elevations substantially which will also protect the pool from being contaminated with stormwater runoff. Check flows to the culvert at West Maple Avenue The calculated flow to this area is 31.45 cfs for a 2 year frequency storm event and 77.41 cfs for a 100 year frequency storm event. The pipe capacity across the road from this location is approximately 60 cfs (inlet control) <64.8 cfs, therefore inadequate pipe capacity exists considering the 36" CMP. It is noted that this condition would flood the street as the flows build up and cross West Maple Avenue. Since this pipe is in poor condition, its replacement with a 36" PEP-S will provide additional capacity to safely convey a 100 year frequency storm. Check flow to the exisitng 12" pipe (12" diameter pipe assumed since it is not evident where this pipe changes to a 24" CMP) The calculated flow to this area is 32.76 cfs for a 2 year frequency storm event and 80.64 cfs for a 100 year frequency storm event. The pipe capacity at this location is 5.6 cfs << 80.64 cfs. This pipe is severely undersized. The swale over the pipe has a capacity of 25 cfs. Therefore, the pipe and swale combined capacity is 30.6 cfs which is less than a two (2) year design storm capacity. This lack of conveyance indicates the adjacent in-ground swimming pool intercepts stormwater runoff approximately once every two (2) years. C. RESULTS In order to correct the above situation the following is required:
V. HILLSIDE DRIVE / HILLSIDE FARMS This site is part of the Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is within the Hillside Farms subdivision which is located off of Churchville Road approximately 3,500 feet northeast of the intersection of Churchville Road and Street Road. The drainage problem exists throughout the development but is worst along Hillside Drive approximately 300' from Churchville Road. At this location, substantial flows are conveyed to TMP's 48-18-17 and 38 which make for wet, swampy and unusable yards as well as creating roadway flooding. The flows are created by a large drainage area (10 acres) with no pipe or other means of picking up the concentrated flows prior to discharge into the rear yard of TMP 48-18-23 has constructed retaining walls, berms and swales in order to keep the flows away from the house. These precautions will most likely not be sufficient in a major storm event due to the magnitude of runoff directed to this location (27 cfs). From here the problem extends into Hillside Drive which is serviced with roadside swales and driveway culverts. The culverts are sized inadequately and one; in front of TMP 48-18-25 has been completley filled which creates a large pond on the upstream side of the culvert during even minor storms. The property owner across the street has installed a bituminous curb in order to keep the water out of his yard, whichnow pools in the street. The Hillside Drive roadway cross culvert is a 24" RCP which feeds into a 15" CMP which is mostly blockd in the inlet structure due to the inlet structure configuration. Several trees and root systems also appear to be too close to the existing storm collection system and are possibly obstructing the pipes. This 15" pipe appears to weave through TMP 48-18-48, discharges to a small swale, enters a 12" CMP routed along the southwest side of Manor Lane, discharges to a 24" RCP roadway cross culvert, to an inlet where it transitions back to a 15" pipe. In essence, it appears that the subdivision was designed with open swales except for 24" culverts at all road crossings. These 24" pipes are acceptable for about a ten (10) year frequency storm event. However, considering that the intermediate areas (swales) are insufficiently piped and filled, the floodplain may now extend out to inlude the residential structures. Some of the drainage, about 7 cfs of the 27 cfs getting to this area is jumping the roadway centerline crown on West Maple Avenue and causing additional flooding of yards and garages. VI. MILLER ROAD A. GENERAL This site is part of Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located immediately east of the intersections of Miller Road and Williams Drive. The drainage problem is the flooding of Miller Drive / Clair Road at the roadway low point during major storm events. The problem appears to be an inadequate stormwater collection system as very few inlets are provided in this area of the development other than at the roadway low point. This causes all runoff to be conveyed (via gutter flow) to the low point where considerable flows converge from both directions. Inadequate inlet capacity at this point creates flooding of the street, street overtopping, and flows across residential lots to the creek. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. Stormwater collection systems are designed to collect and convey a 10 year frequency storm. Flows above this are expected to encroach into the roadway and to be conveyed to an outlet without causing harm to properties for up to a 100 year storm event. This study involves a nine (9) acre drainage area which flows to the inlets located at the low point on Miller Drive. This is a substantial drainage area considering it is to be collected via only two (2) inlets. Normal inlet capacity is approximately 4 cfs, although higher flows, up to 12 cfs can be expected per inlet in sumped conditions (at low points). In order to alleviate the substantial flows to the low point, it is necessary to intercept flows via addiitonal inlets strategically placed upstream. Approximately three (3) acreas are directed to the low point from the west (Miller Road and Williams Drive). An additional six (6) acres are contributed from the east (Clair Road). Optimally, additional inlets / collection piping should be extended toward the east and west to intercept excess gutter flow and route the flows to the low point via underground stormwater piping. However, substantial flows can be intercepted with little disruption to the roadway and existing utilities by only picking up flows from the west and directing them directly to the stream. This alternative avoids expensive roadway cuts and connections to existing inlet structures. It will reduce flows to the low point by aproximately 30%. SHould the reduction not prove to be acceptable once installed, the storm collection system may then be extended toward the east to intercept the desired amount of excess gutter flows. The existing low point currently attempts to intercept 27 cfs during a 10 year frequency design storm. This figure represents more than double the flows that it should be expected to accept. This figure represents more than double the flows that it should be expected to accept. The proposed storm collection system will intercept approximately 8 cfs, thereby reducing flows to the low point to approximately 10 cfs per inlet. While this figure is still excessive, and some roadway flooding is expected (especially if the inlets become partially clogged with vegetation debris), it may be sufficient to maintain the runoff within the roadway and prevent it from overtopping the curb and flowing across residential properties. Another issue studied is the capacity and possible restriction of the stream culvert located at the roadway low point. This 40" x 60" elliptical culvert accepts runoff from a significant, 58.5 acre watershed. Culvert computations performed indicate that this pipe capacity is marginal for a ten (10) year storm event. Normally these larger roadway culverts are designed to flow a one hundred (100) year frequency storm due to potential property flooding, etc. The alternate proposed provides a separate discharge point to the stream, thereby diverting flow and adding capacity to the 40" x 66" culvert during major storm events. C. RESULTS The above alterations will greatly improve the inlet flooding condition at the low point on Miller Road as well as to provide additional pipe capacity for the 66" x 40" culvert located at the Miller Road low point. In order to correct the above situation the following is required:
VII. BEAVER ROAD A. GENERAL This site is part of Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located just north of the intersection of Beaver Drive and Orcap Way. The site is in the Burgundy Hills development just west of Bristol Road The drainage problem is flooding of Beaver Road and the property of 279 Beaver Road. The problems appear to be undersized storm sewers and poorly graded yards. Beaver Road floods severely at this low point which has a large contributing drainage area and substantial runoff accumulation to the low point in Beaver Road. Compounding this problem is that inlets are spaced infrequently and gutter flows may be bypassing the inlets during large storms creating wide gutter flows and turbulent conditions at the low point. Much of these flows are directed to a 24" CMP which appears to be undersized. This pipe is designed to route these flows across the street to a 48" CMP which traverses house #279 Beaver Road where it discharges to a large culvert under Bristol Road. This large pipe also has a very large drainage area and if insufficient capacity exists will possibly flood #279 Beaver Road. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. It is noted that the study area involves approximately 110 acres. A substantial portion of the contributing drainage area (45 acres) is in Northampton Township. While the Northampton drainage area is substantially developed (residential) it is noted that a large detention basin is provided for this area with a 12" RCP outlet pipe. This facility would appear to approximately reduce the Northampton Township flows to that of the pre-developed flow conditions which was assumed for the attached analysis. Stormwater collection systems are designed to collect and convey a 10 year frequency storm. Flows above this are expected to encroach into the roadway and to be conveyed to an outlet without causing harm to properties for up to a 100 year storm event. Since all flows appear to be conveyed to the low point on Beaver Road, additional methods of collecting runoff upstream were not considered. Inlet collection in the vicinity of the low point appears to be inadequate. An existing inlet on the west side of Beaver Road is expected to collect runoff from a 7.5 acre upstream watershed. The computations performed indicate that this inlet capacity is marginal for a 10 year storm based upon submersed inlet capacity. It is noted that this condition will not be acceptable if substantial flows bypass the upstream inlets as discussed above. An additional inlet is recommended at this location. The inlet conveys flows across Beaver Road via a 24" CMP. Flows to this 24" CMP are approximately 44cfs which far exceeds the capacity of the pipe. It is recommended that this pipe capacity be increased by adding another 24" cross pipe. This cross pipe can be added in conjunction with the additional inlet recommended above. Flow capacity of the existing 48" CMP was also studied. The computations indicate that this pipe has capacity to covey a 10 year frequency storm with minor ponding in the street. Conveyance also needs to be provided to convey the flows to an outlet without damage to property. In this case when the pipe capacity is exceeded, Beaver Road floods and flows eventually discharge via a swale between house #279 and 267. A storm easement is in place at this location for the existing 48" CMP. This swale should have capacity to flow the difference between the 100 year design storm and the 48" CMP capacity (210 cfs - 125 ± = 85 cfs). It is noted that pipe capacity could also be increased however this would be very costly. It is therefore recommended that the swale be reconstructed to provide a minimum capacity of 85 cfs.
C. RESULTS The above alterations will greatly improve the flooding condition in the vicinity of the inlet on the west side of Beaver Road, as well as provide additional inlet capacity on both sides of the street. It is noted that roadway flooding depth as measured at the inlets has been eliminated from a 1' depth during a 2 year frequency storm and from complete inundation to about 6" during a 10 year storm event. The increased swale capacity will eliminate flooding of house #279 during large storm events (including a 100 year storm), however flood depth in the roadway are still expected to reach a depth of about 2 feet in severe storms (greater than 10 year frequency). Consideration was given to replacing or constructing a parallel pipe to the 48" CMP. This was found to be very expensive. PADEP and PennDOT permitting would also be required due to the discharge location. It was disregarded because the pipe operates for the designated 10 year frequency design storm. Should this pipe ever have to be replaced due to its condition, it may be considered to also upgrade the pipe's flow characteristics at this time. Another option is to raise the roadway thereby gaining additional head pressure to convey the flows. By raising the road 6", a 10 year frequency storm would be able to be conveyed with no ponding in the roadway. In order to correct the above situation the following is required:
VIII. YALE DRIVE AND NEW ROAD A. GENERAL This site is part of the Upper Southampton's comprehensive plan to alleviate existing drainage problems that currently exist in the township. The site is located on the northern and eastern intersection corner of New Road and Yale Drive, approximately 2,500 feet west of Street Road. The drainage problem is the flooding of New Road and of TMP's #48-6-5-24 and 48-6-6. The existing New Road culvert appears to be undersized as well as the existing storm collection system which runs through private properties at the above referenced intersection. Flows build up on New Road and at an existing lawn inlet on private property (TMP #48-6-5-24) which causes flooding. The existing system is difficult to trace and appears to make a 90 degree bend underground with no drainage structure just downstream of the inlet in front of TMP #48-6-6. New Road has very little longitudinal slope such that when this system backs up, it floods a large portion of the roadway. B. STORMWATER MANAGEMENT In order to correct the above problems, the area has been studied and supporting stormwater computations have been provided for improvements to the area. A fairly large upstream drainage area contributes runoff to the study area (3 acres) which is developed as a residential subdivision. A pipe design has been proposed which involves replacing the New Road culvert and routing flows from the culvert through a a new storm collection system, along New Roadto the intersection of Yale Drive. At this point a storm manhole is proposed as a junction and the storm continues along Yale Drive to the inlet to which it currently discharges. This proposed system will benefit the private properties by routing all upstream flows around the propoerties. The system will be most beneficial to the flow of the system as it will be 24" PEP-S which is smooth bore polyethylene pipe in lieu of the existing 18" CMP (corrugated metal pipe). The new pipe has a much smoother interior, increasing capacity as does the increase in pipe diameter. It is noted that the proposed 24" PEP-S ties into an existing 24" CMP and that not much flow enters the system between the 24" and 18" pipes, thereby another indicator that the 18" pipe is undersized. C. RESULTS The pipe system capacity must be increased in order to eliminate the flooding conditions as the existing yard piping system floods during a 2 year frequency design storm. The existing 18" CMP running diagonally across the front yard of TMP #48-6-6 (not in an easement) is not a good situation. THe curves/bends in the 18" CMP are prone to high friction losses, clogging, bad joints and sink holes. It is recommended that the 18" CMP be removed. This pipe could be replaced with a larger pipe in an easement or the storm collection system can be relocated into New Road and Yale Drive. Replacing the pipe in an easement would help partially, however the downstream yard inlet has very little available head. In other words, this inlet will flood the property due to the low elevation of the inlet as compared to the downstream inlet in Yale Drive. A temporary easement will be required to enter upon the lands of TMP # 48-6-6 to remove the existing pipe. It is recommended to remove the pipe rather than abandon it because it is a CMP (corrugated metal pipe) which will eventually rot and collapse. To acquire an easement on this property for pipe removal or pipe improvement shouldn't be a problem since the property owner will reap the benefits of better drainage. The costs to improve this pipe is not much less than re-routing the entire storm collection system, plus much more pipe capacity will be available by re-routing the storm systemas this will provide a partial parallel system. We found that the parallel pipe system has a capacity for a 100 year design storm while the proposed piping through the yard (Alt #1) only has capacity for a 10 year storm. We therefore recommend that a secondary, parallel pipe collection system be constructed within the roadway of New Road and Yale Drive. We note that this system will be less expensive to construct if located further into the roadway so as to not disturb the existing roll curb. We therefore also recommend that this design (design #1) be constructed. The New Road culvert analysis was performed as a separate computation so that impacts on tail water from the downstream piping system can be evaluated. We found that the New Road culvert will flood in less than a 2 year storm in the existing condition. If the piping downstream of New Road is improved per Design #1, the culvert will have capacity to flow a 2 year storm, but not a 5 year storm. If the New Road culvert is replaced along with the downstream piping, it will flow a 100 year design storm. In order to correct the above situation the following is required: